
Add to Cart
Titanium Reducing Tees And Cross Tees For Titanum Pipe Fittings
In the straight pipe in the pipeline to connect the branch pipe to use Tee or Cross Tee divided into equal diameter and reducing diameter ,Code T(S) T(R),Only the models of reducing tee and cross tee are introduced here ,Equal diameter tee look at our equal diameter tee product range
Material :Gr1 Gr2 Gr5 Gr7 Gr9
Standard:ASTM B363 ASME B16.9, ASME SB363, ANSI B16.9
Surface:Sand blast /Acid picking
Technique :Forged
Quanlity Control : 100% of the X-ray detection (RT) 100% of Surface penetrant inspection (PT)
Application :Tee and Cross tee pipes are used to change the direction of fluid, and can be used for water pipelines, oil pipelines and various liquid chemical materials
DN
|
The end diameter |
Dimensions from center to section |
||||
D1 | D2 | |||||
A | B | A | B | C | M | |
350*350*300 | 356 | 377 | 324 | 325 | 279 | 270 |
350*350*250 | 356 | 377 | 273 | 273 | 279 | 257 |
350*350*200 | 356 | 377 | 219 | 219 | 279 | 248 |
350*350*150 | 356 | 377 | 168 | 159 | 279 | 238 |
400*400*300 | 406 | 426 | 324 | 325 | 305 | 295 |
400*400*250 | 406 | 426 | 273 | 273 | 305 | 283 |
400*400*200 | 406 | 426 | 219 | 219 | 305 | 273 |
400*400*150 | 406 | 426 | 168 | 159 | 305 | 264 |
450*450*400 | 457 | 480 | 406 | 426 | 343 | 330 |
450*450*350 | 457 | 480 | 356 | 377 | 343 | 330 |
450*450*300 | 457 | 480 | 324 | 325 | 343 | 321 |
450*450*250 | 457 | 480 | 273 | 273 | 343 | 308 |
450*450*200 | 457 | 480 | 219 | 219 | 381 | 298 |
500*500*450 | 508 | 530 | 457 | 480 | 381 | 368 |
500*500*400 | 508 | 530 | 406 | 426 | 381 | 356 |
500*500*350 | 508 | 530 | 356 | 377 | 381 | 356 |
500*500*300 | 508 | 530 | 324 | 325 | 381 | 346 |
500*500*250 | 508 | 530 | 273 | 273 | 381 | 333 |
500*500*200 | 508 | 530 | 219 | 219 | 419 | 324 |
550*550*500 | 559 | - | 509 | - | 419 | 406 |
550*550*450 | 559 | - | 457 | - | 419 | 394 |
550*550*400 | 559 | - | 406 | - | 432 | 381 |
600*600*550 | 610 | - | 559 | - | 432 | 432 |
600*600*500 | 610 | 630 | 508 | 530 | 432 | 419 |
600*600*450 | 610 | 630 | 457 | 480 | 495 | 483 |
650*650*550 | 660 | - | 610 | - | 495 | 470 |
650*650*500 | 660 | - | 559 | - | 495 | 457 |
700*700*650 | 660 | - | 508 | - | 521 | 521 |
700*700*600 | 711 | - | 660 | - | 521 | 508 |
700*700*550 | 711 | 720 | 610 | 630 | 521 | 495 |
750*750*700 | 711 | - | 559 | - | 559 | 546 |
750*750*650 | 762 | - | 711 | - | 559 | 546 |
750*750*600 | 762 | - | 660 | - | 559 | 533 |
FAQ
1. Are you the manufacturing or trading company?
Real manufacturing company, started from 2001, nearly 20 years. With 2 sales teams for foreign trading business, started from 2008, more than 10 years experiences.
2. Do you have a dedicated R & D team? Can you design a product for us?
We have a dedicated technical team responsible for research and development. But most of titanium fittings are standard, we can follow ASTM or other you asked.
3. Can you provide samples? Is there a charge?
Samples can be provided for a fee.
4. What is your payment method?
We can accept T / T, LC, trade assurance order from alibaba.com. Samples are 100% prepaid. Orders for mass production are below 1000 USD, 100% prepaid, above 1000 USD, 30% prepaid, and 70% paid before delivery.
5. How long is your delivery time?
Inventory samples: within 3 working days Products for bulk orders: 25-30 days under normal circumstances.
6. After-sales products, how to deal with problems?
Based on our statistics for each year, the probability of problems with titanium products is around 0.8%. There are two main reasons for the problem:
1) Among the products that have problems, 93% are misplaced in pre-sales communication, and the product that the customer needs is not really clear.
2) 5% is an unexpected situation and the extension of the construction period.
3) 2% is the problem of transportation and packaging. During long-distance transportation, the packaging is damaged and the surface is damaged.
7. What is your company's response to the product in question?
1) Verify and blame for pre-sales communication issues. Compensation is handled according to the proportion of liability.
2) We are 100% responsible for problems caused by damaged packaging during transportation.